Credits & Pricing
How Can I Check the Credit Cost Before Generating?
The Studio calculates a quote after the workflow has the settings it needs. Check the displayed cost before you confirm. Changing the model, resolution, duration, number of outputs or reference length can change the quote.
Review the current settings
Confirm the selected model, variant, duration and output count. Reference-led workflows may use the uploaded media duration.
If the quote changes
Review the updated quote before continuing. The run request rejects a stale quote when a supported reference duration or model configuration has changed.
Related answers
Last reviewed 2026-09-14. Product controls and available models may change; the Studio shows the current options before you generate.